Information always connects
In the book Nexus, Yuval Noah Harari argues that the fundamental feature of information is not representing reality but connecting. Sometimes information describes the world accurately and sometimes it does not, but it always creates a network between people.
From this he draws an uncomfortable conclusion: more information, delivered faster, does not by itself produce more truth. Truthful information is rare and expensive; without a deliberate effort to favour it, it gets buried under cheap and abundant information.
This idea describes very precisely what happens in a BIM project. The model is, first and foremost, a network that coordinates dozens of stakeholders. That it also faithfully represents the building is an achievement that has to be built and verified.
The BIM model is a network before it is a replica
We usually talk about the BIM model as a “twin” of the building, that is, as a representation. But its real function in the project is to connect: architects, engineers, contractors, supervision, the client and, ultimately, the maintenance and operations department all work on the same information.
ISO 19650 recognises this implicitly. The common data environment (CDE), the information states (work in progress, shared, published, archived) and the responsibility matrix say nothing about geometry: they describe who delivers what to whom, and when. They are the rules of a network.
Seen this way, every parameter in the model is a link between people:
| Data in the model | Who produces it | Who depends on it |
|---|---|---|
| Fire rating of a door | Architect / fire safety consultant | Fire department, contractor, maintenance |
| Manufacturer and model of equipment | Contractor | Procurement, maintenance, warranties |
| Asset code | Consultant or contractor, per the specification | Maintenance management system |
| Location (level, space) | Design team | Operations, inventory, work orders |
The model can connect all these stakeholders well even when several of those data points are wrong. That is exactly the risk Harari points out.
Truth is costly: more data is not better data
Harari criticises the “naive view” that more powerful information technology necessarily leads to a better understanding of the world. In BIM this naive view has a well-known version: “if everything is modelled, everything is documented”.
Delivery experience says otherwise. A model can contain thousands of elements and hundreds of parameters per element, and at the same time leave the fields that maintenance needs empty, filled with generic values (“TBD”, “Default”, “0”) or named differently from the specification. Cheap information (copying families, leaving default values, exporting everything) is far more abundant than expensive information (checking the installed equipment and recording its actual data).
I have often come across tender documents requiring all parameters to be defined according to a generic list from an engineers’ association: around 1,000 parameters that nobody asked for and nobody needs. It is the purest form of cheap information: plenty of volume, no user and no criteria for verifying it.
Cloud platforms amplify both sides. Forma, Trimble Connect and other CDEs make information flow faster between more people, but they do not make it more truthful. Without controls, they also accelerate the spread of errors.
Tipping the balance towards truth
Following Harari’s line of thought, rejecting the naive view does not mean giving up on truth. It means accepting that truth requires “additional steps” that tip the balance in its favour. In BIM information management, those steps have names:
- Define what information is needed. Information requirements (OIR, AIR, EIR) and the level of information need (LOIN) state which data, on which element, in which format and at which stage. Without them there is nothing to measure truth against.
- Use shared names. Preferring parameters already established in the industry (IFC, COBie, well-known shared parameters) reduces ambiguity: the same name connects everyone with the same meaning.
- Make someone accountable. The responsibility matrix assigns each deliverable to a party. Information without an owner tends to stay in its cheap version.
- Verify before accepting. The formal review before information moves to the “published” state is the self-correcting mechanism of the process.
The first three steps define what is true for the project. The fourth, as fundamental as the first three, is what guarantees that what is delivered actually is.
Verify before sharing and before using
If truthful information is expensive, the project has to decide where it pays that cost. Information management has an answer: verify before information is shared and before others take it on as the basis for their own work. An error caught at the source costs one correction; caught downstream, it costs everything built on top of it.
That is why it pays to design the project with intermediate verification points, not just a final check at handover:
- When moving from “work in progress” to “shared”. The author checks their information against the requirements before exposing it to other disciplines.
- When federating and coordinating. Consistency between models is checked before one discipline takes data from another.
- At each contractual milestone. A formal review against the level of information need for that stage, before progress is approved.
- At final handover. Validation of the data that operations and maintenance will use, before it enters their systems.
Each point acts as the self-correcting mechanism that Harari finds missing in most information networks: it stops errors from spreading before the network amplifies them.
The economics of required information
The other side of verification is discipline in what is requested. If the project generates only the information that was required and that will be verified, the cost of truth becomes manageable: every data point has a user, a format and a check. Asking for “everything”, by contrast, multiplies cheap information and makes it impossible to verify.
Automated validation tools, such as checking models directly in the cloud, make control cheaper. But the economics start earlier: with a specification that asks for little (or rather, only what is needed), asks clearly and states how it will be verified.
When everyone marches in step towards error
Harari observes that a network can be highly effective and, at the same time, organised around false ideas; falsehood does not necessarily weaken it. On a far more modest scale, construction projects know this phenomenon well.
A well-coordinated federated model aligns every team. If a base data point is wrong (a level elevation, a coordinate system, a space classification, an asset code poorly defined in the specification), the error does not stay in one place: it spreads through the network as efficiently as correct data. Everyone works in sync, and in sync they get it wrong.
Some signs that a project is running on a “shared delusion”:
- Progress reports measure the number of elements modelled, not compliance with requirements.
- Nobody can say who verified a data point or against which source.
- The final handover to maintenance is accepted because “the model is complete”, without data validation.
- Errors only surface during operation, when they are most expensive to fix.
Two questions for every data point
In conclusion, Harari suggests that when studying information, asking “is it true?” is not enough; we must also ask “whom does it connect, and what network does it create?”. In BIM information management, both questions are worth asking of every requirement:
- What does this data point connect? Who produces it, who uses it and which decision depends on it. If nobody uses it, it probably does not belong in the specification.
- Who guarantees that it is true? What it is checked against, at what moment and with what consequence if it fails. If nobody verifies it, it will probably arrive in its cheap version.
The role of the BIM consultant sits precisely at this intersection. One half of the job is designing the network (who delivers what to whom), and the other half is building the mechanisms that make what flows through that network true.